According to the report, the expenditure incurred on these projects till November 2018 is Rs 7,97,496.44 crore, which is 37.07 per cent of the anticipated cost of the projects.
from Moneycontrol https://ift.tt/2GHE9v9
Subscribe to:
Post Comments (Atom)
-
In 2017, Mriganka Singh had lost the from the Kairana assembly constituency to an SP candidate. from Moneycontrol https://ift.tt/2upidg0
-
Here's an amazing recipe of a sandwich made with eggs. Eggs, as we all know, are chock-full of nutrients and everything good. from NDT...
No comments:
Post a Comment